Extractor
operating manual.
Standard procedures for contractor setup, work review, and project-scoped payment records. Use this guide to complete each stage consistently and keep testing separate from live operations.
Enter Extractor and confirm your view
Authentication is handled by Cloudflare Access. Extractor then applies the role and contractor profile assigned to your account.
- 01Open the application
Use the official Extractor address. Bookmark it rather than saving a temporary Access address.
- 02Request a login code
Enter your authorized email on the Cloudflare Access screen and select Send login code.
- 03Complete verification
Enter the one-time code delivered to your email. Do not forward or share the code.
- 04Confirm the landing view
Administrators can open Admin View or User Portal. Contractor-only accounts are directed to the user experience.
When work is complete, use Logout and close the browser window. If your account is authenticated but not configured, contact an Extractor administrator for a role and contractor-profile assignment.
Use the navigation by responsibility
Only modules permitted for your role are available.
Use your own authorized account, confirm the active view, and protect one-time access codes.
Read the dashboard in the correct context
The dashboard combines work activity, calculated cost, and recorded payments. Set the period and project before interpreting any result.
Choose Last Full Month, This Month to Date, or Last 30 Days.
Use a specific project for operational review. Use All Projects only for a combined view.
Work and accruals follow work date; cash paid follows payment date.
Check work type, utilization, project allocation, and missing-project exceptions.
Regular plus overtime hours recorded in the selected period. T&T is not included in this headline total.
The overtime portion of Work Hours. Read it as a subset, not an additional total.
Average qualifying hours across contractors with work activity in the period.
Calculated payment items in non-void payment runs, allocated by work date.
Payment packages recorded as paid, allocated by payment date.
Select the relevant workflow
Each route identifies the screens, decisions, and controls assigned to that role.
Clear responsibilities enable each role to act independently while maintaining one controlled operating process.
Standard contractor-to-payment cycle
Complete the sequence in order. Each approved step provides the controlled input for the next.
- 01Create or select the projectProjects
Use Sandbox for training and formula tests. Use an operational project for real work.
- 02Create the contractorContractors
Assign the contractor’s default project before adding a contract.
- 03Assign the contract termsContracts
Record labor, overtime, T&T, mileage, and applicable allowances.
- 04Submit worked timeWork Entries
The work entry inherits its project from the contractor record.
- 05Review and approveWork Review
Verify dates, hours, project, supporting notes, and calculated components.
- 06Preview, approve, and record paymentPayments
Confirm the preview before marking a run paid. Sandbox simulations never move money.
Use Sandbox for controlled testing
Use project SANDBOX for fictitious contractors, training, and formula verification.
Safe to simulate
Create contractors and contracts, submit time, review work, and complete a recorded test run.
No money moves
Payment execution is disabled for Sandbox. Use a clear simulation reference when marking a test run paid.
Watch “All Projects”
Project filters isolate Sandbox. Combined “All Projects” views may still include its recorded activity.
Use clear TEST names, maintain project separation, and preserve the audit history. Accurate records require clarity and consistency.
Filter before reading project KPIs
Select Sandbox · SANDBOX in Project Allocation before interpreting project-specific hours, accruals, or cash paid. A visible Sandbox label is your confirmation that you are not reading an operational project.
Complete contractor setup before contract assignment
Project ownership starts on the contractor record. Every new time entry inherits that project before the assigned contract is evaluated.
Confirm the contractor’s default project before work begins. The person creating the record owns the accuracy of that assignment.
Create the contractor profile
- Open Contractors and choose New Contractor.
- Enter the display name, legal name, code, email, and specialty.
- In Operations, select the contractor’s Default Project.
- For practice, choose SANDBOX — Sandbox and use obviously fictitious contact data.
- Set compliance and payment eligibility deliberately; never enter full banking identifiers into notes.
Assign the payment rules
- Open Contracts, then create a contract or duplicate a suitable existing template.
- Select the contractor and enter the contract identity, dates, cycle, and currency.
- Verify regular rate, OT rule, multiplier or fixed OT rate, and standard hours.
- Set the T&T rule and rate. If it follows labor, confirm the checkbox and any caps.
- Record each applicable allowance separately: lodging, travel, per diem, mileage, meal, and equipment.
Post and review worked time
The work-entry screen stores work facts. It does not calculate payroll.
Contractor, reviewer, and administrator each verify the information they own, creating one dependable record across the full cycle.
Complete the field workflow from the user portal
The contractor workspace is a mobile-oriented route for submitting work facts and following their review and payment status.
My Profile
Review the identity and contractor information associated with the signed-in account. Report incorrect information to an administrator.
My Badge
Review the badge information made available to the user. Badge templates and issuance remain administrative controls.
Submit Shift
Select the contract and work date; record shift type, start and end time, regular, OT and T&T hours, applicable claims, and review notes.
My Shifts
Filter submitted work by status and confirm the work date, contract, inherited project, hours, claims, notes, and any rejection reason.
My Payments
Review pending, approved, and paid payment packages. A visible package records status; it is not a request to edit contract terms.
Submit work facts—not payroll calculations
The payment amount is calculated later from the approved entry and assigned contract.
Contractors own the accuracy of submitted work facts; reviewers own the decision; administrators own the payment record.
Verify the calculation before recording payment
Every component is calculated from the assigned contract and combined in the payment preview.
Accurate, traceable calculations protect operational and financial value for every stakeholder.
Labor+Overtime+T&T+Mileage+Allowances= GrossRebuild the September 21 Sandbox calculation
$400.00 + $150.00 + $200.00 + $325.40
Open and inspect the itemized preview. Fix source records and recreate the preview if the math is wrong.
Approval confirms review readiness. It still does not mean money has moved.
Record the date, method, reference, and notes only after the real-world payment—or an explicit Sandbox simulation—is complete.
Preserve an incorrect or superseded run as void. Never disguise a correction by editing audit history.
Badge management
Badge templates and artwork remain part of the administrative workflow and are not changed by project-scoped payments.
- Use Badge Templates only to manage the reusable design, wording, status, and front/back artwork.
- Use Issue Badge for the holder-specific assignment.
- For a contractor-linked badge, select the contractor first; identity and photo are pulled from that profile.
- Choose the badge project deliberately. Badge assignment does not change the contractor’s default project.
- Preview the badge and public QR page before printing.
Use the reporting surfaces together
Extractor’s management information is distributed across operational modules. Start with the question, then open the record set that answers it.
Dashboard KPIs
Use for period trends, project allocation, work type, contractor utilization, accrued cost, and cash paid.
Control: set period and project first.Work Entries & Review
Use for shift-level facts, hours, claims, inherited project, supporting notes, and approval status.
Control: reconcile exceptions at source.Payment Register
Use for draft, approved, paid, and void payment packages, including references and retained correction history.
Control: never overwrite audit history.Project Assignment
Use Missing Project Detail and assignment controls to resolve legacy or unassigned contractor records.
Control: do not treat Missing Project as valid.Reliable reporting begins with controlled source records and ends with a traceable explanation of every total.
Troubleshooting and glossary
Start with the record that supplies the missing context, then move forward through the cycle.
Payment preview shows no entries
Confirm the work entries are approved, inside the selected date range, and assigned to the same project selected for the run. Paid, rejected, submitted, or already-attached entries are not candidates for a new preview.
A work entry has the wrong project
Check the contractor’s controlled default project. The work entry inherits its project from the contractor when the entry is created—before contract terms are applied. Do not use the contract to “correct” project ownership.
The total is lower than expected
Open the contract and verify every component: regular rate, OT rule and rate, T&T rule and hours, mileage rate, and each allowance. Recreate the draft preview after correcting the source. Void the obsolete run if it must remain in audit history.
A record says “Missing Project” or “Legacy / Unassigned”
Treat it as an exception, not a valid operating project. Assign the contractor to the correct controlled project before creating new work. Do not include unresolved legacy entries in a live project payroll.
Sandbox activity appears in a combined total
Use a specific project filter for operational review. “All Projects” can aggregate Sandbox records; the Sandbox flag prevents real payment execution, but it does not erase its test records from combined reporting.
Correct the source record, document the exception, and use what was learned to strengthen the operating control.
Share your feedback
Tell us what was useful, unclear, or missing. Specific examples help us improve both the manual and the operating process.